Water treatment plant, Eindhoven, Netherlands

  • Yapı Tipi:
  • Endüstriyel Binalar
  • Alt Yapı
Tam Ekran Kapat Sokak Görüntüsü

For the raising of the sedimentation basin within the sewage treatment plant in Eindhoven, the precast elements are connected to each other in a fast and efficient way with the Peikko SUMO® wall shoe connection. 

This dry connection consists of a SUMO® Wall shoe cast in one element and an HPM® anchor bolt cast in the other element. Together this forms the wall shoe joint that absorbs tensile loads. To provide protection against corrosion, the connections are galvanized in this project.

Proje Bilgileri

Yatırımcı:
Waterschap De Dommel
Yapımcı Firma:
Van Boekel Bouw & Infra
Prekast Firması:
Haitsma Beton
Teslim Tarihi:
2019
Tamamlanma Tarihi:
2020