The Victoria Place office building in Whitby, Canada, incorporates an innovative steel beam which allowed for an additional floor on the project. Through the use of DELTABEAM® Composite Beams in conjunction with hollow core slabs, David Mills of Mills & Associates was able to reduce the thickness of the concrete floor. In turn, the complete shallow floor made it possible to fit 3 levels within the municipal height limitation.
"We were able to add square footage to the building and ultimately, increase the future revenue of our customer."
David Mills, Mills & AssociatesDominic Lemieux, P.Eng.
Managing Director
Tel. (888) 734-5561 ext.500
Cep tel. 418-808-8007
[email protected]