DELTABEAM® and PCs Corbel solution used in this iconic tower. DELTABEAM® selected to accommodate high loading and maintain slim floor requirements (DELTABEAM® is position within the floor zone and has no down-stand). PCs Corbel is a hidden corbel solution with high installation and adjustment tolerance – encast part is flush to formwork face & after striking, projecting part is bolted on – thus providing an immediate hangar for DELTABEAM®.
Combination of DELTABEAM® and PCs Corbel results in a very efficient and economic build, without need to engineer non-standard formwork.
John Metcalfe
Managing Director
Tel. +44 1325 318619
Cep tel. +44 776 4660906
john.metcalfe@peikko.com