Spar Muldengasse, Linz, Austria

  • Yapı Tipi:
  • Ticari Binalar
Tam Ekran Kapat

For the Spar Supermarket it was neccessary to have a column free span line from 12 meter, which was solve with hollow cores. The entrance side support of the hollow core was solved with Deltabeams as a Slimfloor construction.

Proje Bilgileri

Yatırımcı:
Spar AG, Salzburg
Yapımcı Firma:
Jos. Ertl, Linz
Yapısal Tasarımcı:
Heinzel und Partner, Linz
Teslim Tarihi:
2013
Tamamlanma Tarihi:
2013

Sunduğumuz Çözümler

Bize Ulaşın

Günther Pock

Günther Pock

Vertrieb & Anwendungsberatung West

Cep tel. +43 664 381 74 05
[email protected]