Søhøjlandets School and Daycare, Ry, Denmark

  • Yapı Tipi:
  • Eğitim ve Kültür
Tam Ekran Kapat

Elegant bracing and efficient for Søhøjlandet School and Children’s House with BESISTA® Rod System

Skanderborg Municipality has built a new school and daycare centre in Ry, creating a new everyday setting for children, staff and the local community.

The new school is designed with flexible spaces for three classes per year group from preschool class to grade 6, with capacity for approximately 450 to 500 pupils and around 50 staff members. The daycare centre will accommodate approximately 50 nursery children, 100 kindergarten children and 35 to 40 staff members.

The project was carried out by Nordstern as turnkey contractor in collaboration with AFRY and C.F. Møller Architects. A strong focus was placed on creating functional and flexible facilities with a low carbon footprint.

For the project, BESISTA® Rod System was selected to brace structures such as stair towers, pergolas and bicycle shelters. As these structures are visible elements of the building, the project required a solution that could meet the technical requirements while supporting a clean and aesthetic architectural expression.

BESISTA® Rod System provides elegant bracing that integrates well with the architecture. The hot-dip galvanized finish also ensures high durability, making the solution well suited for outdoor structures designed to last for many years.

The cross bracing was supplied in collaboration with Simpson Strong-Tie, which adapted its BNG60 connection bracket to fit the bolt in the fork connector of the BESISTA® system.

According to Jacob Møldrup Hansen, Technical Manager at Simpson Strong-Tie, the collaboration between the project partners played an important role in the successful solution:

“Each partner brought their own expertise to the project, which meant that the challenges encountered along the way were turned into solutions rather than problems. At the same time, the BESISTA® system was easy to install despite the 68 different variants.”

Devamını Oku down-arrow.png

Each partner brought their own expertise to the project, which meant that the challenges encountered along the way were turned into solutions rather than problems. At the same time, the BESISTA® system was easy to install despite the 68 different variants.

Jacob Møldrup Hansen, Technical Manager at Simpson Strong-Tie

Proje Bilgileri

Proje Boyutu:
8407 m2
Kat Adedi:
2
Yatırımcı:
Skanderborg Kommune
Yapımcı Firma:
Nordstern _Simpson Strong-Tie
Yapısal Tasarımcı:
AFRY
Mimar:
C.F. Møller Architects
Teslim Tarihi:
2026
Tamamlanma Tarihi:
2026