RHKW waste burning plant, Linz-Mitte, Austria

  • Yapı Tipi:
  • Enerji Yapıları
Tam Ekran Kapat

The RHKW waste burning plant in Linz, Austria was built with a precast concrete frame connected with Peikko’s Anchor Bolts, Columns Shoes and Beams Shoes. Peikko also delivered a substantial amount of Fastening Plates to the site.

Proje Bilgileri

Yatırımcı:
LINZ AG
Yapımcı Firma:
Bilfinger Berger BauGmbH, Linz
Yapısal Tasarımcı:
BHM Ingenieure, Linz
Prekast Firması:
HABAU Hoch- und Tiefbau, Perg
Teslim Tarihi:
2010
Tamamlanma Tarihi:
2011

Bize Ulaşın

Günther Pock

Günther Pock

Vertrieb & Anwendungsberatung West

Cep tel. +43 664 381 74 05
[email protected]