In the basement there is the technical background for the building, on the ground floor of the extension there is a dining hall and a kitchen and on the first floor there are classrooms.
The construction of the building is a combination of steel, concrete, and wood with a green grass roof.
DELTABEAM® Composite Beams were used for the slim floor construction over the basement level and for the slim floor construction over the 1st level in combination with hollow-core slabs.
DELTABEAM® Composite Beams made it possible to bridge wide-spans and made it possible to create an open dining area with a minimum number of slim columns.