13 months construction time with composite structure from Peikko.

A new multipurpose commercial building was erected in Steinach for the elevator manufacturer AS Elevators.

The building complex consists of a main building with a production/warehouse hall as well as a head building with office space and a smaller commercial hall, which is intended for rental.

The complete planning was done with BIM-3D and included complex connections in the area of the crane runway due to limited room height. The connections were worked out together with Peikko.

Thanks to Peikko's DELTABEAM® Frame composite frame system, spans of up to 13 meters could be achieved and the construction time was only 13 months.

Devamını Oku down-arrow.png

Proje Bilgileri

Yatırımcı:
METHABAU
Yapımcı Firma:
METHABAU
Yapısal Tasarımcı:
METHABAU
Mimar:
METHABAU
Teslim Tarihi:
2018
Tamamlanma Tarihi:
2018

Bize Ulaşın

Manuel Schindler

Manuel Schindler

Technische Beratung Verbundbau

Tel. +49 7221 9929612
Cep tel. +49 151 1532 3778
[email protected]