The project of the extension and renovation of Hotel Valavier in Brand was led by the company Swietelsky Bau GmbH of Feldkirch, Austria. DELTABEAM Composite Beams with very complicated connections to connect the new structure with the existing, old concrete structures. After getting to know the benefits of Peikko's Deltabeam it was easy for construction site manager Mr. Martin Heinzel to choose this solution: it did not only enable the company to follow the tough time limit but the solution also offered a superior cost structure.
For Foreman Mr. Albert Meier it was the speed of the erection of the beams and the hollow-cores that was the biggest benefit. Time was the critical factor and by using Deltabeams, the required time, sometimes even for "artistic" in-situ structures was avoided. Also, at the building site the selected solution meant less work on building temporary supports or safety structures that would have otherwise been required. The cutting of unnecessary work naturally reduced the required manpower and thus overall costs - and saved precious time.
Renovated Hotel Valavier started servicing customers just right in time - renovation project was finished in december 2012.