Hofgasse, Innsbruck, Austria

  • Yapı Tipi:
Tam Ekran Kapat

For this building it was neccessary to renew one deck. The solution with DELTABEAM and trapezoid steel plates was the only way, because all party were moved by hand.

Proje Bilgileri

Yapımcı Firma:
ARGE Hitthaller - Gurschler
Yapısal Tasarımcı:
IFS Ziviltechniker GmbH
Mimar:
Arch. DI Astrid Tschapeller, Innsbruck; Arch. DI Michael Steinlechner, Innsbruck
Teslim Tarihi:
2013
Tamamlanma Tarihi:
2014

Sunduğumuz Çözümler

Bize Ulaşın

Günther Pock

Günther Pock

Vertrieb & Anwendungsberatung West

Cep tel. +43 664 381 74 05
[email protected]