Green Day Office Complex, Wrocław, Poland

  • Yapı Tipi:
  • Ofis Binaları
Tam Ekran Kapat Sokak Görüntüsü

The modern office building was built with the use of many ecological solutions and is classified in the LEED certification at the gold level.

More than 1,200 meters of DELTABEAM® Composite Beams based on PCs® hidden corbels were used in the buildings. Additionally, Peikko column connectors and MODIX® rebar couplers were used.

Proje Bilgileri

Proje Boyutu:
30,000 m2
Kat Adedi:
7
Yatırımcı:
Skanska Property Poland
Yapımcı Firma:
Skanska SA
Yapısal Tasarımcı:
GP Konstruktor
Mimar:
Maćków Pracownia Projektowa
Prekast Firması:
Consolis
Teslim Tarihi:
2012
Tamamlanma Tarihi:
2014

Bize Ulaşın