E18 Turku Ring Road, Kaarina, Finland

  • Yapı Tipi:
  • Alt Yapı
Tam Ekran Kapat

Achieving Construction Efficiency Using PSB® Punching Reinforcement System.

The highway intersection in Kirismäki is part of the improvement project of E18 Turku Ring Road.

Construction for the intersection included pile supported embankment slabs which are reinforced against punching failure with Peikko's ETA assessed PSB® Punching Reinforcement system.

Prefabricated double-headed stud rails make flat slab construction possible. Construction time was reduced compared to traditional pile supported mushroom shaped slabs.

Proje Bilgileri

Proje Boyutu:
900 m2
Yatırımcı:
Väylävirasto
Yapımcı Firma:
Destia Oy
Yapısal Tasarımcı:
WSP Finland Oy
Teslim Tarihi:
2021
Tamamlanma Tarihi:
2021

Bize Ulaşın

Topi Laiho

Topi Laiho

Country Manager, Singapore

Cep tel. 040 776 2503
[email protected]