City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Yapı Tipi:
  • Ofis Binaları
Tam Ekran Kapat Sokak Görüntüsü

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Devamını Oku down-arrow.png

Proje Bilgileri

Proje Boyutu:
2100 m2
Kat Adedi:
2
Yatırımcı:
CEF Ltd
Yapımcı Firma:
PCE Ltd
Yapısal Tasarımcı:
Curtins
Mimar:
FaulknerBrowns
Teslim Tarihi:
2016
Tamamlanma Tarihi:
2017